17 October 2026 · Airport pages, timelines, blog
Was: The airport cargo terminal was described as reported operational since June 2026.
Now: The Ministry of Civil Aviation said on 14 July 2026 that the 2,500 m² cargo terminal is being built. The claim and the milestone based on it were corrected.
17 October 2026 · Airport timelines
Was: Phase 1 capacity was given as about 1.5 million passengers a year.
Now: 2 million (20 lakh) passengers a year, as stated by the Ministry of Civil Aviation on 14 July 2026.
17 October 2026 · Sources lists across the site
Was: Wikipedia was cited for the expressway and airport, and a placeholder website was labelled as an official DSIRDA source.
Now: Replaced with government releases (PIB) and the NICDC project page. Press and portal sources are now labelled secondary.
17 October 2026 · Expressway pages
Was: Cost given as ₹5,100–5,800 crore, then as ₹5,800 crore only.
Now: Both official figures shown with their sources: ₹5,800 crore total project cost (MoRTH, 27 February 2026) and over ₹5,100 crore (PIB, 30 March 2026). The two differ and neither release explains why.
17 October 2026 · Homepage, timelines, airport and investment pages
Was: A first trial aircraft landing on 4 June 2026 was listed as a delivered milestone and attributed to AAI.
Now: Labelled as press-reported. Press reports date it 5 June 2026, and no official AAI or Ministry record has been located. It is no longer shown among the homepage’s delivered milestones.
17 October 2026 · Homepage, timelines
Was: “Activation Area core infrastructure complete (June 2026)”, with named industrial allottees, as a delivered milestone.
Now: NICDC describes the Activation Area as “almost completed with trunk infrastructure in place” (page updated 5 August 2025). The allottee names are labelled as reported, with no official allotment record located.
17 October 2026 · Fab facts
Was: “Major structural work complete; cleanroom fit-out and machinery move-in underway” stated as fact.
Now: Labelled as press-reported; no official construction-progress record has been located.
17 October 2026 · Homepage ticker, inventory pages
Was: “18 parcels available right now · Updated 15 Sept”: the date the newest listing was added, presented as an availability check.
Now: Shows how many parcels are listed, when the newest was added, and how many have a current seller confirmation of availability. Listing cards no longer say “Available” without one.
17 October 2026 · Homepage trust strip, site description, FAQ
Was: “Title-clear land only”, “Your name on govt record” and “TP scheme on every listing”.
Now: Removed. Listings include agricultural and NOC-stage titles stated by sellers, outside-SIR parcels have no TP scheme, and the Land-Backed Secured Participation plan does not put the participant’s name on the land record.
17 October 2026 · Investment plans
Was: A plan choice labelled “fixed, secured returns & land ownership”; security described as already created; Plan B shown with unfilled placeholders.
Now: Plan A is described as a targeted, not guaranteed, outcome where the Company may create security, with no ownership. Unpublished terms of both plans are listed before any enquiry button, and Plan B is marked as not open for commitment.
17 October 2026 · How we research
Was: “Every parcel we list is visited before it is listed” and “100% parcels visited before listing”, while listing pages say their contents come from the seller.
Now: The methodology now says listings are published from seller-supplied records, and each parcel page shows which checks have actually been done.
17 October 2026 · Maps, about and guide pages
Was: “All 16 sanctioned TP scheme plans.”
Now: The 16 plans include the draft Lothal scheme, so they are described as sanctioned and draft scheme plans.
17 October 2026 · Homepage
Was: The listing count was labelled as parcels, and listing notes said “limited unallotted inventory”, “active resale market” and “NMHC Phase 1A opening drives corridor interest”.
Now: Labelled as listings, since ten are rate ranges for an area rather than identified parcels. The notes no longer assert scarcity, demand or project status, and each card says the rate is an asking rate and availability has not been reconfirmed.
12 November 2026 · “Near Dholera Airport” guide
Was: The airport’s operations date was called “a target published by the developer”, and the July 2026 progress figures were dated September 2026.
Now: The target was set by the Ministry of Civil Aviation on 14 July 2026, and the guide now says that the September–October 2026 window has passed without a published DGCA licence.
12 November 2026 · Ground report, milestone timelines
Was: The Ahmedabad–Dholera semi high-speed rail line was described as planned to run at up to 220 km/h with a station at Dholera International Airport.
Now: The Ministry of Railways release of 13 May 2026 gives no speed, so the 220 km/h figure was removed. The station beside the airport terminal is now attributed to the Civil Aviation Minister, who stated it on 14 July 2026.
Found something wrong? Send the page, the claim and any supporting document through the contact page. If we agree, we correct it and add it here.