Guide
What a Dholera TP Scheme and FP Number Actually Mean
A TP scheme converts your survey number into a demarcated final plot. How the process works, and why the scheme stage matters more than the village name.
20 August 2026 · 6 min read
Research & analysis
Everything we publish is dated and sourced. Where a claim rests on a target rather than a delivered milestone, we say so on the page rather than in a footnote.
The six areas
The balanced answer: what is delivered, what is still a target, who it suits, who should avoid it, and the realistic holding period.
Read the analysisThe boundary decides planning control, permitted use, infrastructure and price. Compared side by side, with how to check which side a parcel is on.
Compare both sidesIndicative rates from 2006 to today, and the current inside/outside SIR rate matrix with the caveats attached.
View the dataThe sanctioned DSIRDA development plan 2010–2040 in full — all 15 land-use zones, the road hierarchy and every TP scheme boundary.
Open the planAll sixteen town planning schemes, the villages in each, and the GPS anchors for the region’s key landmarks.
Explore mapsWhat each land-use class permits, what it costs on the DICDL card, and who it actually suits.
Compare zonesVerified construction progress, what the trial landing did and did not mean, and measured distances from the airport to every corridor.
Check the statusThe one anchor project that is finished. Route, interchanges, travel times, and which land markets it actually changed.
See the routeGujarat’s other growth story. Why Lothal is not another Dholera SIR, what the ₹4,500 crore maritime complex actually funds, and how to assess land around a destination.
Read the analysisCoastal Regulation Zone is a statutory regime, not a planning preference — the four categories, how distances are measured, and what only the CZMP can answer.
Understand CRZThe airport, expressway, semiconductor fab and NMHC — what is commissioned, what is in testing, what is a target date.
See the evidenceGuides and analysis on TP schemes, due diligence, price drivers, the SIR boundary and NRI rules.
Read articlesStraight answers on title, zoning, returns, risk and NRI eligibility — including the awkward questions.
Browse FAQsAt a glance
Pulled from the pages above. Each links through to the workings behind it.
Prime land, 2016→2026
₹2,500 → ₹15,000
About 6.0× per sq yd
Entry-level, 2016→2026
₹800 → ₹4,700
About 5.9× per sq yd
Expressway
Delivered
Inaugurated 31 March 2026
Airport
~80%
Operations targeted late 2026
10 milestones already behind us, 7 still ahead as published targets. We never present the second list as the first.
See both timelines →All sixteen sanctioned scheme plans are viewable and downloadable here — the documents that actually define final plot boundaries.
Open the plans →DICDL allotment rates run from ₹400/sq m for solar land to ₹8,000/sq m for CBD. Zoning restricts what you can build — it is not a discount.
Compare zones →Longer reads on the questions that decide whether a Dholera purchase works out.
Guide
A TP scheme converts your survey number into a demarcated final plot. How the process works, and why the scheme stage matters more than the village name.
20 August 2026 · 6 min read
Update
Dholera infrastructure in 2026, separated into delivered, under construction and targeted — with the source behind each claim.
29 August 2026 · 7 min read
If it is a good question we will answer it, and probably add it to the FAQ.